Uruguay OHS Regulatory Update — October 2026

· Report · A4

Uruguay’s Labor Inspectorate regulation changes (Decree 224/026). It takes effect 60 days after publication: November 30, 2026, counting calendar days. Lifting a preventive shutdown can take up to 72 h, the company and the committee are invited on the walk-through, and the reduction on a minor fine drops from 30% to 10%.

VG-NAD-2026-10-EN · Public edition · 4 pages

Download PDF

Uruguay’s Labor Inspectorate has a new rulebook

Executive Order 224/026: published October 1, 2026, in force 60 days later. It was the only general-scope OHS regulation published in the Official Gazette (Diario Oficial) this month.

  • Nov 30, 2026 Takes effect. 60 days after publication (art. 56), counting calendar days.
  • up to 72 h To lift a preventive shutdown. Previously, 24 h. Work doesn’t resume without the inspector’s written clearance (art. 30).
  • 10% Reduction on a minor fine. Previously, 30%. If it was corrected on time and is paid within 10 business days (art. 54).

Replaces Executive Orders 371/022 and 19/023 It brings together in a single text the powers, organization and procedure of the General Labor and Social Security Inspectorate (Inspección General del Trabajo y de la Seguridad Social, IGTSS) (art. 58). Cases already under way before it takes effect keep the old rules (art. 57).

Executive Order 224/026

  • Sep 16, 2026 Signed
  • Oct 1, 2026 Published in the Official Gazette
  • Nov 30, 2026 In force (60 calendar days)

What changes in an inspection visit

Visits are still unannounced, at any time (art. 7). What’s different is the walk-through, the shutdown and the fine.

  • Walk-through on environmental conditions
    Until now (371/022)
    If there was a union or a committee, the inspector could be accompanied by one of its representatives (art. 25)
    Once in force (224/026)
    The inspector must invite a company representative and, if there is one, a union or committee representative; it goes on the record (art. 22(b))
  • What can be shut down as a precaution
    Until now (371/022)
    Premises, sections, machines or equipment (art. 8(g))
    Once in force (224/026)
    Adds tasks (art. 8(g))
  • Lifting the shutdown
    Until now (371/022)
    Within 24 h at most (art. 33)
    Once in force (224/026)
    Within 72 h at most; work doesn’t restart without the inspector’s clearance (art. 30)
  • Time to fix what was ordered
    Until now (371/022)
    Up to 15 business days; more if construction work is needed (art. 29)
    Once in force (224/026)
    Up to 15 business days; more if the fix needs actions that take longer (art. 26)
  • Minor fine, fixed on time and paid promptly
    Until now (371/022)
    30% reduction, paid within 10 days (art. 51)
    Once in force (224/026)
    10% reduction, paid within 10 business days (art. 54)

Reduction on a minor fine fixed on time

  • Before
    Reduction (%)
    30
  • Under 224/026
    Reduction (%)
    10

The Inspectorate’s time limits

More time to investigate, less to close the case file.

  • 3 months Inspection proceedings. From the first action, extendable by the same period (art. 32). Previously, 2 months.
  • 60 days Legal Division report. From receipt of the case file (art. 34). Previously, 90 days.
  • 12 months Full investigation. From the first action, extendable once (art. 36). The previous 18-month limit ran from when the file reached the Legal Division: they measure different things and don’t compare directly.

Time limit for inspection proceedings, in months (without extension)

  • Inspection proceedings
    Before
    2
    Under 224/026
    3

Worth reviewing before November 30

None of this is new paperwork. It’s knowing who does what on the day the inspector shows up.

  1. 1.Who goes along on the walk-through?. On a visit about environmental conditions, the company will be invited and it goes on the record. Make it someone who knows the plant and its controls (art. 22(b)).
  2. 2.Is the correction documented?. If a task or a machine is shut down, lifting it is requested with documentary proof, and it can take up to 72 h from that request (art. 30).
  3. 3.Who reads the Unified Work Roster inbox?. Summonses arrive at the email on the Unified Work Roster (Planilla de Trabajo Unificada) or at the registered electronic address, with the date, the time and the documents to bring (art. 21(b)).
  4. 4.Where is each order’s deadline tracked?. Up to 15 business days. If the fix takes longer, a reasonable deadline is set; it helps to request it with the reason (art. 26).
  5. 5.Can documents be sent electronically?. They can be submitted electronically under the guidelines of the Ministry of Labor and Social Security (Ministerio de Trabajo y Seguridad Social, MTSS) (art. 25).

More briefings

All briefings
Contact

Let's talk about your operation.

Tell us what you need and which app you're interested in. We'll show you how it fits your company's day-to-day.

  • Workflow assessment
  • App configuration
  • Dedicated deployment support
Or email us
hola@vivogrc.com

Ask for a demo

We'll reply by email.

Apps you're interested in (optional)

Pick as many as you like, or all of them.

By sending this form you accept our Privacy Policy and Terms of Service.